HOME
certificazioni
-
ENG
THE FIRM
CERTIFICATIONS
REFERENCES
NEWS & EVENTS
THE MACHINE SHOPS
ASSISTANCE
CONTACTS

Panzeri spa
22070 Luisago (CO)
via Milano, 1A
ph. +39 031.550.210
fax +39 031.550.220
panzeri@panzeri-spa.it

p.iva e c.f. 00616780136


Panzeri do Brasil Ltda.

Av. Angélica, 2466, 3º andar, cj.31
01228-200, São Paulo, SP
ph. +55 11 3151 2547
fabiana@panzeridobrasil.com.br



Panzeri Suisse SA

Via Calprino, 18
CH 6902 Lugano - Paradiso
ph. +41 791 265 740
info@panzerisuisse.ch

Project romanoassociati.com
Development VOLO Web

© Copyright 2009
Company data L.88/09

Panzeri spa
All rights reserved
 
     
 
Rome "Termini" subway junction Rome

 
Rome “Termini” Line“A” – Line “B” subway junction - Package 3.
The realisation of plants for the modernisation of the Termini “A” - “B” line subway junction-package 3. The modernisation project calls for the improvement of the functional and pre-station aspects of the junction itself. The station’s plants and security systems will be enhanced and modernised: architectural barriers will be removed and all the work needed to improve the juncture point for the improvement of passenger flow distribution to emergency operations will be performed. Finally, the inside areas and the Cinquecento Square above will be upgraded .

 
     
     
 
MILAN’S SUBWAY LINE 5 Milan


The realisation of the air conditioning, foul air extraction plants and fire-fighting installations for the 10 km long track of subway which will connect various parts of the City of Milan from Garibladi to Bignami.

The air conditioning, plumbing plants and fire extinguishing/sprinkler systems and a deposit will be designed and installed at nine stations:

- Bignami
- Ponale
- Bicocca
- Cà Granda
- Istria
- Marche
- Zara
- Isola
- Garibaldi

 

 
     
     
 
The “SCALA” THEATRE Milan

 
Data regarding the installations at Milan’s “Scala” Theatre.
No less than 21 air treatment and refrigeration units systems were installed for a total load of 3,300 KW.

The air ducts themselves weighed 200,000 kg and the plumbing pipes a full 300,000 kg; more than 300 trips were needed to transport them to the work site. Many of these trips were run at night in order to avoid any type of disturbance to the City’s lively historical centre. 

The fire extinguishing system is equipped with an innovative spray-type system to protect the area under the cupola and a foam system for the stage pit.

The acoustics challenge was met through detailed research and analysis. Each installed piece of equipment and its distribution system were adapted with special silencers or sound proof housing.

Underground water from the highest levels of the city water table was effectively used as the condensation fluid for the refrigeration units and contributed to the prevention of the raising of the City’s underground water table.


 
     
     
 
The “ARCIMBOLDI” THEATRE Viale dell'Innovazione 20 Milan

THE PROJECT
Heating installation and water supply:
. air-conditioning plants
. plumbing and sanitary installations 
. fire extinguishing systems 

Electrical installation:
. energy transformation
. power installation
. standard and emergency lighting

Special electrical installation:
. the automatic control system of the entire complex
. stage lighting
. PA system
. control booth
. fume and gas detection system
. intrusion detection systems 
. telephone communications system
. data transmission
. TV

Special mechanical equipment:
. on-stage lifting and mechanics 

Lift installation:
. lifts

Air-conditioning
In order to condition the air of the entire theatre, the installations supply a heat rating of 4,200 KW with a cooling effect of 4,400 KW distributing treated air through 24 units for 300,000 mc/hr blown into the environments via 160,000 kg of steel air ducts to 3,500 wall and ceiling mounted air distribution units.  The hot and cooled water supplied by AEM is fed to the various treatment units through a 210,000 kg network of steel pipes.

Electrical installation
The complex industrial electrical system can supply 4,000 KW of electrical current and has a minimum 1,000 KW guaranteed reserve with a double emergency system. This enormous load is distributed over a 600 km network of electrical wires via 110 control and distribution panels.

Lighting technology
Over 3,000 light bulbs guarantee the normal illumination of the on and off stage areas, another 600 are activated during performances. More than 8 km of optic fibre are used to guarantee emergency lighting.

Elevators
The theatre’s audiences, service personnel and equipment can be transported in nine elevators and one goods lift able to guarantee a rate of 200 people per minute. 

System automation
The enormous technical installation of the theatre is commanded by a single computerised and automated system able to manage 2,000 individual points which control the functions of:
. systems on-off
. air-conditioning regulation
. light regulation
. alarm and safety control
. maintenance programming
. consumption optimization and accounting

A comparison
The system which has been installed here can be compared to, for the potency of the plumbing and electrical systems installed and managed by it, to such complex structures as:
. a 4 star hotel with 300 rooms
. a 150 bed hospital
. a building with 1,300 outlets
. a 35,000 person stadium

Visit the theatre’s website at: www.teatroarcimboldi.it

 
     
     
 
EUROMA 2

Shopping center at Castellaccio / Rome


THE PROJECT:

28       air treatment units
12       coolers
5         boilers
9,800  sprinkler heads

 

 
     
     
 
M.A.R.T.

Polo Museale Rovereto / TN


The project:
- air-conditioning installation
- heating
- plumbing and sanitary installations 
- fire extinguishing systems 

We further installed a district heating station, 3 refrigeration units for a total of 3,500,000 fg/hr, 22 air treatment units for a total capacity of 342,000 m3/hr, 200,000 kg of air ducts, more than 1,800 mt of linear air outlets and 50 pumping units.

 

 
     
     
 
MILAN’S GARIBALDI–LANCETTI TRANSIT STATION

Milan


The project:

- air-conditioning plants
- fire extinguishing systems
- plumbing and sanitary installations

 

 
     
     
 
Grand opening of the new location

Luisago


On a beautiful sunny day, Panzeri celebrated the grand opening of our new headquarters in Luisago.
We had the pleasure of receiving many visitors – experts, collaborators, clients, partners and lots of friends – who all share our passion for our work, and have continued to support us throughout the years.
Our commitment to growth and development shows through our current projects: our new workshop and offices are another step along a challenging and important path.
We would like to thank everyone for their commitment, and we wish you all the best! Panzeri spa.

» Watch the video

 
     
     
 
Grand opening of the new location

Luisago

 
     
     
 
SUBWAY Line 3

Milan


Milan Underground, line 3.

Four new stations:
• Dergano
• Affori centro
• Affori FBM
• Comasina
 
     
     
 
L’Aquila project C.A.S.E.

L’Aquila


Post-earthquake reconstruction.
Work completed in 3 months.

588  homes 
21  condensing boilers 
mq 31.080  floor panels 
1.638  cast iron radiators 
588  heat meters 
800  Psolar panels 
42  solar boilers 
3.056  domestic water appliances 
 
     
     
 
DA VINCI CENTER

Shopping center / Rome


Shopping center
 
     
     
 
PALAZZO BELTRAMI

Milan


Museum Palazzo Beltrami
 
     
     
 
TOWER EUROSKY EUR

Rome


office tower / Eur Rome
 
     
     
 
SEA

Airports of Linate and Malpensa
 
     
     
 
“SANT’ANNA” HOSPITAL

Como


“SANT’ANNA” Hospital in Como
 
     
     
 
TOWER B

Milan


The Garibaldi Complex - "Tower B" / Milan
 
     
     
 
PORSCHE

Milan


The New “Porsche” Headquarters / Milan nord
 
     
     
 
CITY LIFE

Milan


Milan / Location Hadid